Instrument dashboard

ELBIT SYSTEMS LTD (ESLT)

NASDAQ · US

ESLT · Market chart

Loading chart…

Latest Pine script: 2026-11-18

Market structure

PRICE LEVEL INTELLIGENCE

Reference close · 2026-11-20
LEVEL / SOURCEPRICE LEVELPRICE
Primary Falling Wedge LowerTECHNICAL · Primary descending support boundary. Anchors: 2026-05-18 low 745.36 and 2026-11-05 low 650.00. x is elapsed 24-hour periods (86,400,000 milliseconds) since 2026-05-18 09:30 America/New_York. The denominator accounts for the daylight-saving transition between the anchors. Historical interactions include 2026-06-25 low 727.76, 2026-06-29 low 721.04, and October 2026 lows near the projected boundary. The line converges with the upper boundary. At the 2026-11-17 close of 720.53, its projected value is approximately 643.31, making it underlying support.
—
Primary Falling Wedge UpperTECHNICAL · Primary descending resistance boundary. Anchors: 2026-03-17 high 1016.06 and 2026-10-29 high 815.13. x is elapsed 24-hour periods (86,400,000 milliseconds) since 2026-03-17 09:30 America/New_York. Intermediate swing-high interactions include 2026-06-11 high 916.51 and 2026-08-06 high 876.85, both near the projected boundary. The line converges with the lower boundary. At the 2026-11-17 close of 720.53, its projected value is approximately 798.20, making it overhead resistance.
—
ATR Support 2025-11-17TECHNICAL · The boundaries are the low and high of the 2025-11-17 control bar. True range was 43.97 against Wilder ATR(14) of 15.03, or 2.93 times ATR. The region contains the independently calculated October 2025 monthly R1 at 514.15, whose fixed pivot line originates 2025-11-03. At the 2026-11-17 close of 720.53, price is above the upper boundary, making the fixed region support.
503.23 – 517.00
ATR Support 2026-02-04TECHNICAL · The boundaries are the low and high of the 2026-02-04 control bar. True range was 49.11 against Wilder ATR(14) of 23.36, or 2.10 times ATR. The region contains the independently calculated January 2026 monthly PP at 674.75, whose fixed pivot line originates 2026-02-02. At the 2026-11-17 close of 720.53, price is above the upper boundary, making the fixed region support.
670.90 – 720.01
ATR Resistance 2026-10-15TECHNICAL · The boundaries are the low and high of the 2026-10-15 control bar. True range was 44.88 against Wilder ATR(14) of 20.89, or 2.15 times ATR. The region contains the independently calculated September 2026 monthly R1 at 734.90, whose fixed pivot line originates 2026-10-01. At the 2026-11-17 close of 720.53, price is below the lower boundary, making the fixed region resistance.
721.11 – 746.26
ATR Resistance 2026-08-11TECHNICAL · The boundaries are the low and high of the 2026-08-11 control bar. True range was 85.62 against Wilder ATR(14) of 28.89, or 2.96 times ATR. The region contains the independently calculated July 2026 monthly PP at 787.77, whose fixed pivot line originates 2026-08-03. At the 2026-11-17 close of 720.53, price is below the lower boundary, making the fixed region resistance.
760.42 – 800.43
ATR Resistance 2026-05-26TECHNICAL · The boundaries are the low and high of the 2026-05-26 control bar. True range was 90.94 against Wilder ATR(14) of 30.64, or 2.97 times ATR. The region intersects the independently calculated October 2026 monthly R1 at 846.31 after that pivot line originates on 2026-11-02. At the 2026-11-17 close of 720.53, price is below the lower boundary, making the fixed region resistance.
820.00 – 858.76
ATR Resistance 2026-03-17TECHNICAL · The boundaries are the low and high of the 2026-03-17 control bar. True range was 141.56 against Wilder ATR(14) of 43.22, or 3.28 times ATR. The upper boundary at 1016.06 aligns exactly with the independently established primary falling-wedge upper boundary's initial anchor on 2026-03-17. At the 2026-11-17 close of 720.53, price is below the lower boundary, making the fixed region resistance.
925.00 – 1,016.06
Breakout 225.64TECHNICAL · The structure script fixes this horizontal level at the 2024-03-01 high of 225.64, originating at 2024-03-01 09:30 America/New_York. The label script instead positions its corresponding label at 2024-10-28, creating a historical anchor-date discrepancy between the scripts. The fixed technical line remains at 225.64. The 2026-11-17 close of 720.53 is above the level, making it support.
225.64
Nov 2025 R1TECHNICAL · Calculated from completed October 2025 monthly OHLC: high 529.99, low 471.03, and close 476.75. Traditional monthly PP = (H + L + C) / 3 = 492.59; R1 = 2 × PP − L = 514.15. The fixed horizontal line originates 2025-11-03. It also intersects the 2025-11-17 ATR control-bar region. The 2026-11-17 close of 720.53 is above the level, making it support.
514.15
Double Low 650.00TECHNICAL · Fixed horizontal level originating at the 2026-11-05 low of 650.00. The 2026-10-12 low of 650.68 provides an earlier closely aligned historical interaction, supporting the approximate double-bottom interpretation. The 2026-11-17 close of 720.53 is above the level, making it support.
650.00
Feb 2026 PPTECHNICAL · Calculated from completed January 2026 monthly OHLC: high 740.67, low 581.00, and close 702.57. Traditional PP = (H + L + C) / 3 = 674.7467, rounded to 674.75. The fixed horizontal line originates 2026-02-02 and intersects the 2026-02-04 ATR control-bar region. The 2026-11-17 close of 720.53 is above the level, making it support.
674.75
Nov 2026 S1TECHNICAL · Calculated from completed October 2026 monthly OHLC: high 815.13, low 650.68, and close 779.68. Traditional PP = 748.4967; S1 = 2 × PP − H = 681.8633, rounded to 681.86. The fixed horizontal line originates 2026-11-02. The 2026-11-17 close of 720.53 is above the level, making it support.
681.86
Oct 2026 PPTECHNICAL · Calculated from completed September 2026 monthly OHLC: high 760.35, low 680.03, and close 682.01. Traditional PP = (H + L + C) / 3 = 707.4633, rounded to 707.46. The fixed horizontal line originates 2026-10-01. The 2026-11-17 close of 720.53 is above the level, making it support.
707.46
Oct 2026 R1TECHNICAL · Calculated from completed September 2026 monthly OHLC: high 760.35, low 680.03, and close 682.01. Traditional PP = 707.4633; R1 = 2 × PP − L = 734.8967, rounded to 734.90. The fixed horizontal line originates 2026-10-01 and intersects the 2026-10-15 ATR control-bar region. The 2026-11-17 close of 720.53 is below the level, making it resistance.
734.90
Analyst 12-month low targetANALYST · Lowest analyst 12-month price target
739.00
Nov 2026 PPTECHNICAL · Calculated from completed October 2026 monthly OHLC: high 815.13, low 650.68, and close 779.68. Traditional PP = (H + L + C) / 3 = 748.4967, rounded to 748.50. The fixed horizontal line originates 2026-11-02. The 2026-11-17 close of 720.53 is below the level, making it resistance.
748.50
Aug 2026 PPTECHNICAL · Calculated from completed July 2026 monthly OHLC: high 831.08, low 723.58, and close 808.65. Traditional PP = (H + L + C) / 3 = 787.77. The fixed horizontal line originates 2026-08-03 and falls inside the 2026-08-11 ATR control-bar region. The 2026-11-17 close of 720.53 is below the level, making it resistance.
787.77
Analyst 12-month median targetANALYST · Median analyst 12-month price target
825.00
Nov 2026 R1TECHNICAL · Calculated from completed October 2026 monthly OHLC: high 815.13, low 650.68, and close 779.68. Traditional PP = 748.4967; R1 = 2 × PP − L = 846.3133, rounded to 846.31. The fixed horizontal line originates 2026-11-02 and intersects the projected 2026-05-26 ATR control-bar region. The 2026-11-17 close of 720.53 is below the level, making it resistance.
846.31
Analyst 12-month high targetANALYST · Highest analyst 12-month price target
960.00
GEX put wall · 2026-12-18GEX · Options positioning
700.00
GEX call wall · 2026-12-18GEX · Options positioning
850.00

Sign in to view price levels

Technical, analyst and options-derived levels are available to signed-in members.

Sign in
AI-Ready Research Pack

Download the available financial metrics, calculation methodology and latest technical price levels for ESLT.

Download research pack
Files included for this instrument:
  • SEC financial metrics calculation guide
  • Financial metrics for the current year
  • Technicals and future GEX levels
Company fundamentals

Financial health

Revenue••••••Profitability••••••Cash flow••••••Capital structure••••••
Available reporting years2025

Sign in to request beta access

Financial health insights are in a limited beta.

Sign in
Valuation framework

Valuation

Midpoint fair value••••••
Cash Flow DCF••••••
Revenue unit economics••••••
Reporting periods: 0 quarters available

Sign in to request beta access

Valuation tools are in a limited beta.

Sign in